蓝亚实验室 - 测试、检验与认证服务

博客

Saudi Arabia eCall Regulation 2028 – SASO 2944:2023 Update

Saudi Arabia Postpones Mandatory eCall Implementation to 2028: What Vehicle Manufacturers Should Do Now

Saudi Arabia's eCall requirements have been an important consideration for automotive manufacturers preparing to enter the local market. In 2026, another regulatory update changed the implementation timeline.

Under the latest official decision, the mandatory application date of SASO 2944:2023 has been postponed from January 1, 2027 to January 1, 2028.

For manufacturers, the extra time is useful. But it should not be mistaken for a reason to put eCall development on hold.

What Has Changed?

SASO 2944:2023 covers the technical requirements for emergency call systems in motor vehicles.

The revised implementation date was confirmed in an official Saudi regulatory publication dated August 28, 2026.

The updated schedule sets January 1, 2028 as the mandatory date for all vehicle models covered by the standard.

This gives manufacturers additional time to review their existing vehicle configurations, communication modules and compliance documentation.

Why Does the Extra Time Matter?

eCall is not simply an SOS button connected to a mobile network.

A properly integrated system involves several components working together:

  • The telematics control unit (TCU)

  • Cellular communication hardware

  • GNSS positioning

  • Emergency call triggering logic

  • Voice communication

  • Minimum Set of Data (MSD) transmission

An issue in any of these areas can affect the overall performance of the emergency call function.

For vehicles developed for multiple markets, the communication configuration and regional requirements also need to be considered.

What Should Manufacturers Do Before 2028?

The revised timeline gives engineering teams an opportunity to address potential issues before the mandatory date.

A practical preparation plan should include:

1. Review the applicable standard

Confirm that the vehicle configuration and target model fall within the scope of SASO 2944:2023.

2. Check communication compatibility

Review cellular module support, network compatibility and the communication functions required by the applicable specification.

3. Validate emergency call functions

Check manual and automatic activation, voice connection, positioning information and MSD transmission where required.

4. Prepare technical documentation

Keep test reports, product specifications and software version records consistent with the final production configuration.

More Time Does Not Mean Less Preparation

The postponement to 2028 gives manufacturers more room to prepare, but eCall remains an important vehicle safety requirement for the Saudi market.

Companies that complete their technical assessment early will be in a better position when the implementation date approaches.

Blue Asia Labs supports automotive manufacturers and suppliers with eCall-related testing, technical evaluation and vehicle electronics compliance services.


SHARE

本文作者

Mandy

CNAS 认可实验室工程师,分享射频、EMC 与全球认证一线笔记。

获取报价

在线服务

[email protected] 4000259520 8613534225140
首页 热线电话 手机号码 电子邮箱
回到顶部
联系我们
我们使用 Cookie 以提升您的在线体验。继续浏览本网站,即表示您同意我们使用 Cookie。

Cookies

关于 Cookie

Cookie 是访问网站时存储在您设备上的小型文本文件。蓝亚实验室使用 Cookie 记住您的语言偏好、保障表单安全,并了解访客如何使用我们的页面。

我们使用的 Cookie

必要 Cookie——语言选择与表单安全,无法禁用。
性能 Cookie——用于改进网站的匿名访问统计。

我们不使用广告或追踪 Cookie。您可以随时在浏览器设置中屏蔽或删除 Cookie,但部分功能可能受影响。

联系我们

对本政策有疑问?请发送邮件至 [email protected]。